Plant Description
Nubaria III power project consists of one module 750 MW comprised of two 250 MW combustion turbine generators (CTGs). Each one feeds exhaust gases to its respective heat recovery steam generator (HRSG) with no supplementary firing. Steam from the two HRSGs is fed to one 250 MW, reheat, condensing steam turbine generator (STG). Nitrogen Oxide emissions are controlled by dry low NOx (DLN) combustors. An inlet air filtration system supplies filtered combustion air to the CTGs. The steam exhausted through the steam turbine feeds a once-through cooling, single-pass, divided water-box condenser.
Power is generated at manufacturer standard voltage in the CTGs and the STG, stepped-up through main transformers and fed to the national grid via a 500 kV, conventional switchyard. The Rayah El Nasery Canal provides the plant cooling water.
The project contracting plan utilized a multi-package system. Fourteen (14) contracting packages and purchase orders procured the equipment and services.
Project Details | |
Owner | Middle Delta Electricity Production Company |
Location | West Delta, Egypt |
Date of Award | November 2005 |
Contractual Duration | 50 months |
Scope |
- All conceptual and detailed design of plant systems - Preparation of all tenders, the documents included commercial and legal terms and followed the financing institutes and Owner procurement guidelines - Project management, construction management, startup and commissioning management, which included initial operation support. |