Economical Studies Egypt

Region:

Status:

20MW PHOTOVOLTAIC STUDY

Year: 2015
Client/Project: Internal Use / EGYPT
Description: The study is implemented to measure the feasibility and return on investment for PGESCo to penetrate the photovoltaic Egyptian IPP market.

ASSIUT THERMAL POWER PLANT 1X650 VERSUS 1X850 MW

Year: 2014
Client/Project: EEHC / UEEPC / EGYPT
Description: This study was prepared in order to compare the economic aspects of two different approaches of upgrading the capacity to the Egyptian grid.

EL MAHMOUDIA POWER PLANT

Year: 2014
Client/Project: Beltone private equity / EGYPT
Description: The Baseline Study describes the initial analysis of the technical and economic parameters for the implementation of new proposed 480MW Mahmoudia Combined Cycle Power Plant and presents the concept of the project.

ASSIUT THERMAL POWER PLANT 1X650 MW VERSUS 1X730 MW

Year: 2014
Client/Project: EEHC / UEEPC / EGYPT
Description: This study was prepared in order to compare the economic aspects of two different approaches of upgrading the capacity to the Egyptian grid.

REVIEW BENCHMARK POWER PLANT PROJECT FEASIBILITY STUDY

Year: 2013
Client/Project: Benchmark / EGYPT
Description: Review Benchmark feasibility study for a 750MW combined cycle IPP project.

WEST DAMIETTA POWER PLANT CONVERSION PROJECT – COOLING WATER SYSTEM COMPARISON STUDY

Year: 2013
Client/Project: EEHC/ EGYPT
Description: This study was prepared to study the technical and economic feasibility for the use of different cooling systems.