South Helwan Power Plant 3×650 MW

Plant Description South Helwan power project is designed to include 3×650 MW steam thermal power plant to interconnect with the National Unified Power System (NUPS) through a 500 KV GIS switchyard. The power block is comprised of three identical Rankine cycle turbine generator units, each with a nominal rated capacity of 650 MW. The units … Continue reading South Helwan Power Plant 3×650 MW

South Helwan Water Treatment Facilities

South Helwan power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps … Continue reading South Helwan Water Treatment Facilities

Golden Valve 2nd place

A snapshot picture originally extracted from South Helwan Project 3D model, was augmented with a real picture from the STG Hall of Unit1 from the site and processed by the lately formed “Rendering and Physical Modeling Group” using SmartPlant Review. The image presents the visually complexity of the critical piping work in the STG Operating … Continue reading Golden Valve 2nd place

PGESCo won 2017 Golden Valve Competition 2nd Place Award

A picture showing the interior rendering of the Steam Turbine Building of South Helwan Power Plant Project highlighting main equipment and the piping work won 2nd place Award in 2017 Golden Valve Competition held by Hexagon PPM (previously Intergraph). The picture is rendered using SmartPlant Review 2015 R1 utilizing the Photo-Realism and Visual-Effects add on … Continue reading PGESCo won 2017 Golden Valve Competition 2nd Place Award

PGESCo Award in the Golden Valve competition 2015

For the third year in a row, PGESCo participated and won an award in Intergraph’s Golden Valve Awards competition. In 2015, PGESCo achieved 2nd place in the Visually Complex Category for a South Helwan design. PGESCo delegates received a plaque and monetary award at the HxGN Live Conference in the USA References http://www.intergraph.com/ppm/customers/awards/goldenvalve/default.aspx http://www.intergraph.com/ppm/customers/awards/platinumpipe/2015.aspx https://hxgnlive.smarteventscloud.com/connect/sessionDetail.ww?SESSION_ID=16486

Ongoing Projects

The following listed projects are under construction: Substation Sub-contractor Year Equipment Type/Rating Configuration 1 SOUTH HELWAN 500 kV Alstom Grid 2015 500 kV GIS (Alstom Type T155), Busbar rating: 550 kV, 3150 A, 40 kA, 1sec, Breaker rating: 2000 A 7 Bays, Double Busbar-Double Breaker 2 AL SHABAB 220 kV switchyard Extension: Siemens 2015 220 … Continue reading Ongoing Projects

Technical Studies Egypt

GAS TURBINES INLET AIR COOLING STUDY Year: 2010 Client/Project: EEHC/Giza North & Banha Description: A case study for the effect of inlet air-cooling to the gas turbine on power augmentation. COMPARATIVE STUDY OF CONVENTIONAL BURNERS VS DLN BURNERS FOR GE MACHINE FRAME 9E AL SHABAB POWER PLANT Year: 2012 Client/Project: EDEPC/AL Shabab & West Damietta … Continue reading Technical Studies Egypt

PGESCo Award in the Golden Valve competition 2015

For the third year in a row, PGESCo participated and won an award in Intergraph’s Golden Valve Awards competition. In 2015, PGESCo achieved 2nd place in the Visually Complex Category for a South Helwan design. PGESCo delegates received a plaque and monetary award at the HxGN Live Conference in the USA References http://www.intergraph.com/ppm/customers/awards/goldenvalve/default.aspx http://www.intergraph.com/ppm/customers/awards/platinumpipe/2015.aspx https://hxgnlive.smarteventscloud.com/connect/sessionDetail.ww?SESSION_ID=16486

PGESCo Award in the Golden Valve competition 2015

May 1, 2016

For the third year in a row, PGESCo participated and won an award in Intergraph’s Golden Valve Awards competition. In 2015, PGESCo achieved 2nd place in the Visually Complex Category for a South Helwan design. PGESCo delegates received a plaque and monetary award at the HxGN Live Conference in the USA For the third year … Continue reading PGESCo Award in the Golden Valve competition 2015

Technical Studies Egypt

FEASIBILITY STUDY FOR THE COAL FIRED POWER PLANT 2X700 MW—800 MW Year: 2015 Client/Project: Orascom Construction /International Petroleum Investment Company Description: Feasibility study report developed where, this stage concludes base configuration of the power plant, selected technology, Coal parameters, supply and logistics to be used as inputs for the second stage of “Inputs to Financial … Continue reading Technical Studies Egypt

PGESCo Award in the Golden Valve competition 2015

January 17, 2016

For the third year in a row, PGESCo participated and won an award in Intergraph’s Golden Valve Awards competition. In 2015, PGESCo achieved 2nd place in the Visually Complex Category for a South Helwan design. PGESCo delegates received a plaque and monetary award at the HxGN Live Conference in the USA For the third year … Continue reading PGESCo Award in the Golden Valve competition 2015