Technical Studies Egypt

FEASIBILITY STUDY FOR THE COAL FIRED POWER PLANT 2X700 MW—800 MW

Year: 2015
Client/Project: Orascom Construction /International Petroleum Investment Company
Description: Feasibility study report developed where, this stage concludes base configuration of the power plant, selected technology, Coal parameters, supply and logistics to be used as inputs for the second stage of “Inputs to Financial Modeling. Also includes developing the RFP specification.

CO-GENERATION POWER PLANT- COMBINED CYCLE WITH DESALINATION METHODS (IN PROGRESS)

Year: 2015
Client/Project: EEHC/EDEPC/IPP
Description: A comparison between the different methods of seawater desalination, to help the customer in choosing the optimum solution.

SUPERCRITICAL VS SUBCRITICAL POWER PLANTS

Year: 2014
Client//Project: UEEPC/Assiut
Description: Comparison between the super-Critical vs Sub-Critical power plants to help the owner to decide whether to convert the plant to super-critical or not

PRE-FEASIBILITY STUDY FOR THE COAL FIRED POWER PLANT 2X700 MW—800 MW

Year: 2014
Client/Project: Orascom Construction /International Petroleum Investment Company
Description: The Pre-feasibility study report developed over two stages where the first stage is to issue the “Draft Baseline Report” that shall address all technical opportunities and approaches, this stage shall conclude base configuration of the power plant, selected technology, Coal parameters, supply and logistics to be used as inputs for the second stage of “Inputs to Financial Modeling

FEASIBILITY STUDY COMBINED HEAT & POWER PROJECT (WADI)

Year: 2013
Client/Project: Wadi Group / EGYPT
Description: A study was carried out to investigate the feasibility of utilizing cogeneration plant (Combined Heat & Power system). to provide steam to the Wadi Food Olive oil extraction process through new Steam generators and provide power from small gas turbines to act as primary source of power while utility connection remain as backup.

STEAM ADD-ON COMBINED CYCLE—IRAQ

Year: 2013
Client/Project: Orascom Construction /Baiji
Description: Evaluation and optimization of steam add-on CC power plant for the existing GTs firing HFO, as an upgrade for the Baiji project. The study included the steam parameters and pressure levels of the heat recovery steam generators. Also, the study included the cooling technologies to suit the existing plant.

DIFFERENT COOLING TECHNOLOGIES STUDY – COOLING TOWER, AIR COOLED CONDENSER & ONCE THROUGH SYSTEMS

Year: 2013
Client/Project: EEHC/AL Shabab & West Damietta
Description: Comparative study for using different condenser cooling technologies for West Damietta CCPP Steam Add-on and Introduction to the new application of ACC to help the owner decide to use the ACC in future projects.

COMPARATIVE STUDY OF CONVENTIONAL BURNERS VS DLN BURNERS FOR GE MACHINE FRAME 9E AL SHABAB POWER PLANT

Year: 2012
Client/Project: EDEPC/AL Shabab & West Damietta
Description: Comparative study between the DLN and conventional burners for GE gas turbines in Kharafi projects to help the owner to tack the decision to change the burners to DLN ones.

PROPER SELECTION OF WATER TREATMENT SYSTEM

Year: 2012
Client//Project: UEEPC/South Helwan
Description: An introduction to new technologies in water treatment systems and to help the owner to properly select the suitable WT system to the project.

PRELIMINARY ECONOMICAL STUDY FOR 1X650 MW SUPERCRITICAL THERMAL PLANT VERSUS 1X850 MW SUPERCRITICAL THERMAL PLANT

Year: 2012
Client/Project: EEHC/CEPC / EGYPT
Description: This study was prepared in order to compare the economical aspects of implementing two different approaches of implementation a thermal power plants.

CO-GENERATION POWER PLANT—LIBYA

Year: 2010
Client/Project: Arabian Consulting Engineering Services Company
Description: Introduction of different configurations of cogeneration plants to produce electric power and desalinated water.

GAS TURBINES INLET AIR COOLING STUDY

Year: 2010
Client/Project: EEHC/Giza North & Banha
Description: A case study for the effect of inlet air-cooling to the gas turbine on power augmentation.

 

 

 

Economical Studies Egypt

20MW PHOTOVOLTAIC STUDY

Year: 2015
Client/Project: Internal Use / EGYPT
Description: The study is implemented to measure the feasibility and return on investment for PGESCo to penetrate the photovoltaic Egyptian IPP market.

ASSIUT THERMAL POWER PLANT 1X650 VERSUS 1X850 MW

Year: 2014
Client/Project: EEHC / UEEPC / EGYPT
Description: This study was prepared in order to compare the economic aspects of two different approaches of upgrading the capacity to the Egyptian grid.

EL MAHMOUDIA POWER PLANT

Year: 2014
Client/Project: Beltone private equity / EGYPT
Description: The Baseline Study describes the initial analysis of the technical and economic parameters for the implementation of new proposed 480MW Mahmoudia Combined Cycle Power Plant and presents the concept of the project.

ASSIUT THERMAL POWER PLANT 1X650 MW VERSUS 1X730 MW

Year: 2014
Client/Project: EEHC / UEEPC / EGYPT
Description: This study was prepared in order to compare the economic aspects of two different approaches of upgrading the capacity to the Egyptian grid.

REVIEW BENCHMARK POWER PLANT PROJECT FEASIBILITY STUDY

Year: 2013
Client/Project: Benchmark / EGYPT
Description: Review Benchmark feasibility study for a 750MW combined cycle IPP project.

WEST DAMIETTA POWER PLANT CONVERSION PROJECT – COOLING WATER SYSTEM COMPARISON STUDY

Year: 2013
Client/Project: EEHC/ EGYPT
Description: This study was prepared to study the technical and economic feasibility for the use of different cooling systems.