The Plant is located in Suez Site.

 
Customer Minimize

East Delta Electricity Production Company, Eng. Tarek Youssef, Chairman

 
Scope Minimize

Scope of work for Phase I

(Procurement and Design)

 
Description Minimize

The project consists of one 650 MW steam thermal power plant.

 

 

Capacity : 650 MW

Date of Completion : 2014

Suez 650 MW Thermal Cycle Power Plant Minimize

The project consists of one 650 MW steam thermal power plant for interconnection to the National Unified Power System (NUPS) through 220 KV GIS Switchyard facilities. The power block comprises one Rankine cycle turbine generator unit with a nominal rated capacity of 650 MW. The unit should be capable of generating rated capacity using natural gas, residual (mazout) oil, or a combination of both. The unit station arrangement shall include an enclosed turbine building, an open boiler building, a control room, and all associated structures and facilities.