Location Minimize

Mediterranean Sea Coast, approximately 29 KM West of Alexandria City next to the Sidi Krir 1&2 plant.

 
Customer Minimize

Globeleq Company.

 
Scope Minimize

Overall engineering, procurement and construction (EPC) contractor.

 
Description Minimize
- Two outdoor, dual fuel fired (natural gas and heavy oil), pressurized furnace systems generators.
- All necessary auxiliary and balance of plant equipment.
- Two 340 MW each, indoor condensing steam turbine generator units.
 

Capacity : 680 MW

Date of Completion : 2001

Sidi Krir Units 3&4 680 MW Power Station First BOOT Power Plant Minimize

Sidi Krir 3&4 Power Station is the first BOOT project in Egypt.The developer was Intergen and the main Contractor was Bechtel. The plant is located on the Mediterranean Sea Coast, approximately 29 KM West of Alexandria City next to the Sidi Krir 1&2 plant PGESCo is the overall engineering and Procurement execution office for the overall project. The station consists of the following major components:

  • Two 340 MW each, indoor condensing steam turbine generator units.
  • Two outdoor, dual fuel fired (natural gas and heavy oil), pressurized furnace systems generators.
  • All necessary auxiliary and balance of plant equipment.

 

The Power Block Island for the two generating units includes steam generator structures of outdoor type construction and a fully enclosed turbine generator structure. A single stack is designed to serve the two units and is located North of the

Power Block Island.   

 

Technical Details