Mediterranean Sea Coast, approximately 29 KM West of Alexandria City.

 
Customer Minimize

West Delta Electricity Production Company, an affiliate Company to the Egyptian Electricity Holding Company.

 
Scope Minimize
Overall engineering, procurement and construction management (EPCM) contractor.
 
Description Minimize

- Two units 320 MW each indoor condensing steam turbine generator units.      
- Two outdoor, dual fuel fired (natural gas and heavy oil), pressurized furnace system generators.

- All necessary auxiliary and balance of plant equipment.

 
Sidi Krir Units I&II 650 MW Power Plant

PGESCo is the overall engineering, procurement and construction management (EPCM) contractor for the Power station. The station consists of the following major components:

  • Two units 320 MW each indoor condensing steam turbine generator units.
  • Two outdoor, dual fuel fired (natural gas and heavy oil), pressurized furnace  system generators.
  • All necessary auxiliary and balance of plant equipment.
  • A GIS 220 KV indoor switchyard, 220 KV transmission 500 KV lines.
  • A residential colony.
The major building modules include a turbine generator with turbine cycle equipment, steam generator, control complex, water treatment, a 220 KV switchyard an administration building, a warehouse and a maintenance shop facility.

Sidi Krir 1 & 2 Power Station is located on the Mediterranean Sea Coast, approximately 29 KM West of Alexandria City.  