El-Tebbin, Helwan, Cairo.

 
Customer Minimize
Cairo Electricity Production Company, an affiliate Company to the Egyptian Electricity Holding Company.
 
Scope Minimize

Overall engineering, procurement and construction management (EPCM) contractor.

 
Description Minimize

The facility is designed to include a 2x350 MW thermal power plant for interconnection to the National Unified Power System (NUPS) through the new GIS 220 KV switchyard facility.

 
El-Tebbin Thermal Power Plant 2x350 MW

The facility is designed to include a 2x350 MW Thermal Power Plant for interconnection to the National Unified Power System (NUPS) through the new GIS 220 KV switchyard facility.

The power block comprises two identical rankine cycle turbine natural gas, residual (mazout) oil, or a combination of both. The Two-unit station arrangement shall include an enclosed turbine building, an open boiler building, a common control room and all associated structures and facilities. The facility will include water treatment plant that will provide make-up water to the cycle. A new 220 KV GIS switchyard will be constructed to deliver the generated power to the national grid.  

Technical Details