El kureimat 90 km Cairo south, on Nile river.
Overall engineering, procurement and construction management (EPCM) contractor.
Steam from the two HRSGs will be fed to one 250 MW (nominal), reheater, condensing steam turbine generator (STG).The estimated facility's net output will be approximately 750 MW (nominal, ISO).
Capacity : 750 MW
Date of Completion : 2010
The facility will be designed to include a power block consisting of two 250 MW (nominal, ISO) combustion turbine generators (CTG), each feeding exhaust gases to its respective heat recovery steam generator (HRSG).
Steam from the two HRSGs will be fed to one 250 MW (nominal), reheat, condensing steam turbine generator (STG).The estimated facility's net output will be approximately 750 MW (nominal, ISO).
This output will be achieved by burning natural gas in the combustion turbines with no supplementary firing in the HRSGs. Nitrogen oxides emissions will be controlled by dry low nitrogen oxides combustors. An inlet air filtration system will be included to supply suitable filtered combustion air to the CTGs. The steam exhausted from the steam turbine will be fed into a once-through cooling, single-pass, divided water-box condenser. Power is generated at manufacturer's standard voltage in the CTGs and the STG, stepped-up through main transformers, and fed to the utility grid via the extension of the existing a 220 KV, gas-insulated switchgear (GIS) switchyard. Water for The Power Plant cooling demand will be obtained from the Nile River.