Login     Tuesday, March 16, 2010
Location Minimize

The plant is located in El Ain El Sokhna Site.

 
Customer Minimize

East Delta Electricity Production Company.

 
Scope Minimize

Overall engineering, procurement and construction management (EPCM) contractor.

 
Description Minimize

The project consists of 2x650 MW supercritical steam thermal power plant for interconnection to the National Unified Power System (NUPS) through the new 500/220 KV GIS Switchyard facility.

 
El Ain El Sokhna 2x650 MW Supercritical Thermal Power Plant

The plant is located in El Ain El Sokhna Site. The project consists of 2x650 MW supercritical steam thermal power plant for interconnection to the National Unified Power System (NUPS) through the new 500/220 KV GIS Switchyard facility.The power block comprises two identical Rankine cycle turbine generator units, each with a nominal rated capacity of 650 MW.  The units should be capable of generating rated capacity using natural gas, residual (mazout) oil, or a combination of both.  The two-unit station arrangement shall include an enclosed turbine building, an open boiler building, a common control room, and all associated structures and facilities.

Print